Foundation FAQ
Serving Pennsylvania and Maryland
Contact Us
Click to Enlarge
Non Excavation Method
Click to Enlarge
Stabilizes wall in current position.
Surface soil is moved as needed for
access to top of basement wall.
Holes are drilled and reinforcement bars
are placed vertically into hollow block.
Excess reinforcement bars are cut off
at the holes.
The wall is pumped full of cement.
Reparging the top of the wall on the exterior is done as needed.
The cracked mortor joints in the basement are repointed.
Keystone Foundation Repair Inc.
Your Foundation Repair Experts!
Large Slide Shows
Directions
229 Petersburg Road : Carlisle, PA 17013
Site Map